|
The Welker Adjustable Probe with the injection nozzle
(AP-3MI) is designed to insert the chemical injection
nozzle into a low pressure pipeline (500 max psi).
For pipeline pigging or for service on the nozzle,
the unit can be quickly withdrawn without pipeline
operation interruption. The nozzle will disperse the
chemical in a more efficient manner than the typical
straight tube.
The Welker AP-3MI can be used with any chemical injection
system. For proper sizing of the nozzle, estimated
injection rates should be provided to Welker. The
AP-3MI can be inserted through a 1" full open
ball valve. A number of nozzle styles are available
and can be sized to meet your specific needs. Line
pressure, pump pressure and your gpm needs will assure
correct nozzle for the application. Specify insertion
length (18" - standard).
INSTALLATION INSTRUCTIONS
To install unit, determine insertion length required.Push
probe through probe plug to that point and tighten
top cap of tubing union. Trim excess probe length
to within 2 inches of the union desired and attach
top works of unit to probe and tighten tubing connector.
Loosen tubing union cap and slide probe to fully retracted
position. Snug tubing union probe plug until fair
amount of friction is attained from PTFE ferrule in
the plug. Close the top ball valve. Mount AP-3MI to
the pipeline valve (1 " full open ball or gate
valve). Slowly open the pipeline valve and carefully
push probe into line. Do not allow head or hands to
extend above probe as it is being inserted. Depending
on pipeline pressure,considerable force may be required
to insert the probe into the pipeline. Use care to
keep the probe straight. A 500 psi pressure on the
pipeline would exert force of 30 pounds on 1/4"
tubing. When the probe is in the correct position,
tighten the tubing union cap (lock it on tubing) and
snug union a bit more, being careful not to destroy
PTFE ferrules. Connect pump outlet line to CV-1 inlet.
Open the ball valve on the end of probe.
WITHDRAWAL INSTRUCTIONS
Close the top valve and disconnect the pump line
from the CV-1. Get a very firm grip on the top probe
valve, loosen the hex cap on top of the union completely
and then loosen the union body slightly so that the
probe can slide out through the PTFE ferrule.
Always be careful to have a firm grip on probe until
it is inserted and tightened or fully retracted as
pipeline pressure will want to push probe up when
loose. Do not stand over probe during installation
or removal.
The gauge will serve two purposes: 1 ) it will indicate
pipeline pressure with the ball valve open; 2) By
pinching the valve, you will be able to see the gauge
pressure increase when pump is operating.
The most common problem people have with probes happens
when they close pipeline valves on the probe. This
can make for a very unnecessary problem!
PERFORMANCE SPECIFICATIONS
Material:
Working Pressure:
Temperature:
Connections:
|
316 stainless steel,
Viton and PTFE
1 440 psi
-20 °F - 250 °F
1" and up - flanged or NPT
|
|